REFERENCES
RENEWABLE ENERGY SOURCES
PV, wind and water power plants
2014
FVE 100 kW CEITEC Scientic Park Brno
Design: Execution drawings LV
Installation: Turn-key delivery
Client: OHL ŽS, a.s.
2013 – 2021 / maintenance / in progress /
FVE Romkumulo 10 MW, Rumunsko
Design: Execution drawings MV, LV, Extra low voltage, IS
Installation: Turn-key delivery
Maintenance
Client: ROMKUMULO SRL
2013 – 2020 / maintenance / in progress /
FVE Development Dva 1,6 MW, Rumunsko
Design: Execution drawings MV, LV, Extra low voltage, IS
Installation: Turn-key delivery
Maintenance
Client: SC RC Development Dva SRL
2013 – 2019 / maintenance / in progress /
FVE Reinvest 3,3 MW, Rumunsko
Design: Execution drawings MV, LV, Extra low voltage, IS
Installation: Turn-key delivery
Maintenance
Client: Reinvest Urziceni SRL
2012 – 2019 / maintenance / in progress /
FVE Pchelarovo 2.5 MW + 0.5 MW, Bulharsko
Design: Execution drawings MV, LV, Extra low voltage, IS
Installation: Turn-key delivery
Maintenance
Client: AES Solar Bulgaria
2011 – 2021 / maintenance / in progress /
FVE Zdravets 15,6 MW, Bulharsko
Design: Execution drawings MV, LV, extra weak current, IS
Installation: Turn-key delivery
Maintenance
Client: Solera, Shabla, Teres, PSP Zdravets
2012
FVE MD Logistika 2×30 kW
Design: Execution drawings LV
Installation: Turn-key delivery
Client: MD Logistika, a.s.
2009 – 2010
Brno Solar Park III. 5,4 MW
Design: Execution drawings
Installation: Turn-key delivery
Maintenance
Client: BS Park III. s.r.o.
2009 – 2010
Brno Solar Park I. 3,4 MW + 4,7 MW
Design: Execution drawings
Installation: Turn-key delivery
Maintenance
Client: BS Park I. s.r.o.