PLAAN COMPANY
The company plaan czech, s.r.o. The company plaan czech s.r.o. belongs to the leading Czech companies in the electrical field. The company provides complex services to its domestic and foreign customers in the area of investment construction. Our aim is to provide services that ensure trouble-free operation for users, pride for our employees from the done work, development of our company and the opportunity to support social projects.
COMPANY HEADQUARTERS
In 2020, we moved to our new company headquarters. The new building meet not only the needs of the company and our employees, but also a modern energy standard and smart solutions.
In 2023, we installed a photovoltaic power plant on the roof of the building to increase self-sufficiency in electricity supply.
COMPANY HISTORY
The company plaan czech, s. r. o. was established in 2006 as a design and supply company in the electrical field and the aim of realizing “turnkey” projects.
The company was established by colleagues, who participated as a management and technical team on realization of big projects such as
Toyota Peugeot Citroen Automobile in Kolín (CZ) and Kia Motors Slovakia in Žilina (SK).
COMPANY CERTIFICATION
The company plaan czech, s.r.o. introduced and uses an integrated management system for quality management, environment, safety and health protection at work in accordance with requirements of standards ČSN EN ISO 9001, ČSN EN 14001 and ČSN ISO 45001.
The main principles and aims are contained in the company policy:
THE SCOPE OF OUR WORK
INDUSTRY
The major contract was Hyundai Motor Manufacturing Czech. We elaborated Detail Design project, electrical part (medium voltage, low voltage, measurement and regulation, weak current) for the company Takenaka. Subsequently, we realized the entire scope of work – medium voltage and low voltage – in the form of engineering for companies Takenaka and Elektromont Brno. Our company managed the complete installation of the aforementioned units, for individual operations we hired subcontractors for work and supplies.
This was followed by the series of contracts that we realized as a supplier, where we supplied the complete electrical part, or selected sections.
We currently provide supplies by electrical system "Design and Build“.
PHOTOVOLTAIC
Since 2008, we have been engaging in the design, projection and realization of photovoltaic power plants. In the same year, we expanded the platform of our services and we have been providing services on ours realized contracts.
Since 2009, we have also been supplying turnkey photovoltaic power plants. Brno Solar Park I. to III. with a capacity of 22 MWp belong to our largest projects in the field of photovoltaic. In total, we have realized photovoltaic power plants with a capacity of 30 MWp in the Czech Republic and 5,7 MWp in Slovakia.
We realize projects abroad through our subsidiary company Plaan & Premier Power Bulgaria OOD and we own companies plaan & PP BG (Bulgaria), plaan Spain Energy Investment (Spain). In total, we have realized photovoltaic power plants with a capacity of 18 MWp in Bulgaria, 15 MWp in Romania through these companies. Now we are preparing photovoltaic power plants with a capacity of 3 MWp in Spain.
Service and monitoring are an important part of these deliveries of photovoltaic power plants. We supervise and ensure service for photovoltaic power plants with an approximately capacity of 80 MW.
OTHERS
We co-founded the company FitCraft Recyklace as a part of expanding the platform of provided services. This company is engaged in waste management and especially recycling of photovoltaic panels.
PLACE OF OUR WORK
The company plaan czech s.r.o. realizes projects not only in the Czech Republic, where it has already built photovoltaic power plants with a total capacity of 200/30 MWp, but also in Slovakia (5,7 MWp), in Bulgaria (18 MWp) and Romania (70/15 MWp).
Through its foreign subsidiaries, the company works also in Spain, where the project with a capacity of 3 MWp is currently preparing. In total, the company ensures service for photovoltaic power plants with an approximately capacity of 80 MW.